Province | Subbasin | % |
---|---|---|
Columbia Cascade | Methow | 40.00% |
Wenatchee | 60.00% |
Previous: | Next: |
---|---|
56662 REL 125: 1996-040-00 EXP MID-C COHO O&M/M&E |
|
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Obtain environmental compliance | B: 165. Produce Environmental Compliance Documentation for all applicable work on Coho Reintroduction | 01/31/2019 | 01/31/2019 | |
Manage and administer project, February 1, 2018 through January 31, 2019 | C: 119. Manage and Administer 2018-2019 Project for Mid COlumbia Coho Reintroduction | 01/31/2019 | 01/31/2019 | |
CWT or PBT mark fish BY2017 | D: 158. Mark/Tag Animals - Subcontract CWT and/or PBT of approximately 2,000,000 BY17 coho pre-smolts | 11/30/2018 | 11/30/2018 | |
Coho redd counts and spawning composition for the 2018 return year | E: 157. Conduct spawning ground surveys for the 2018 return year in the Wenatchee Basin | 01/31/2019 | 01/31/2019 | |
2018 return year coho redd counts and spawning composition | F: 157. Conduct spawning ground surveys for the 2018 return year in the Methow Basin | 01/31/2019 | 01/31/2019 | |
Completed database | G: 157. Collect biological data from 2018 coho brood at spawning | 01/31/2019 | 01/31/2019 | |
CWT recovery data from the 2018 BY | H: 157. Extract CWT from 2018 brood coho snouts collected at spawning and on spawning ground surveys | 01/31/2019 | 01/31/2019 | |
PIT tag fish 2017 BY | I: 158. Mark/Tag Animals - PIT-tag 58,000 BY17 coho pre-smolts | 01/31/2019 | 01/31/2019 | |
Analyze data from 2018 BY | J: 162. Analyze and interpret M&E data from 2018 brood | 01/31/2019 | 01/31/2019 | |
Enter data | K: 160. Enter data into and maintain local databases | 01/31/2019 | 01/31/2019 | |
Collect data during 2018 emergence | L: 157. Collect/Generate Field and Lab Data to determine 2018 emergence timing, growth and distributio | 01/31/2019 | 01/31/2019 | |
Completed Annual Report | M: 132. Submit Annual Report for the FY17 period (2/1/17 to 1/31/18) | 01/31/2019 | ||
Tissue analysis by CRITFC for genetic monitoring | N: 157. Analyze genetic tissue samples for PBT analysis of parental groups | 01/31/2019 | 01/31/2019 | |
Completed Annual Report | O: 132. Begin preparation for annual reporting of the CY18 period (1/1/18 through 1/31/19) | 01/31/2019 |
Primary Focal Species | Work Statement Elements |
---|---|
Coho (O. kisutch) - Unspecified Population |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 02/01/2018 | ||||||
B | 165 | Produce Environmental Compliance Documentation for all applicable work on Coho Reintroduction | 02/01/2018 | ||||||
C | 119 | Manage and Administer 2018-2019 Project for Mid COlumbia Coho Reintroduction | 02/01/2018 | ||||||
D | 158 | Mark/Tag Animals - Subcontract CWT and/or PBT of approximately 2,000,000 BY17 coho pre-smolts | 02/01/2018 | ||||||
E | 157 | Conduct spawning ground surveys for the 2018 return year in the Wenatchee Basin | 02/01/2018 | ||||||
F | 157 | Conduct spawning ground surveys for the 2018 return year in the Methow Basin | 02/01/2018 | ||||||
G | 157 | Collect biological data from 2018 coho brood at spawning | 02/01/2018 | ||||||
H | 157 | Extract CWT from 2018 brood coho snouts collected at spawning and on spawning ground surveys | 02/01/2018 | ||||||
I | 158 | Mark/Tag Animals - PIT-tag 58,000 BY17 coho pre-smolts | 02/01/2018 | ||||||
J | 162 | Analyze and interpret M&E data from 2018 brood | 02/01/2018 | ||||||
K | 160 | Enter data into and maintain local databases | 02/01/2018 | ||||||
L | 157 | Collect/Generate Field and Lab Data to determine 2018 emergence timing, growth and distributio | 02/01/2018 | ||||||
M | 132 | Submit Annual Report for the FY17 period (2/1/17 to 1/31/18) | 02/01/2018 | ||||||
N | 157 | Analyze genetic tissue samples for PBT analysis of parental groups | 02/01/2018 | ||||||
O | 132 | Begin preparation for annual reporting of the CY18 period (1/1/18 through 1/31/19) | 02/01/2018 |